Realize the function of low hitch and high use. It is assembled at the bottom of the main body of the building at one time, attached to the building and lifted continuously with the increase of floor height, the whole operation process does not occupy other lifting machinery, greatly improving the construction efficiency, and the site environment is more humane, easier to manage and maintain, and the effect of civilized operation is more prominent.

2022-12-30 10:20

Climbing process: all check the climbing organization, frame and obstacles → install electric hoist and debug pre-tightening → dispense with the upper frame and structure pulling connection → dispense with the safety net on the outside of the frame at the broken piece → raise the frame 100mm → remove the unloading seat → raise the frame one floor high → install the unloading seat → pulling connection to the upper climbing frame (the distance between pulling connections is not more than 6m) → close the safety net on the outside of the frame at the broken piece → raise the Wire rope turnover to the upper installation position → remove the lowermost anti-fall bar, installation to the uppermost position → construction of a layer → installation of the upper adjustable tie rod, attached wall guide seat → check before raising → prepare to enter the next

2022-12-30 10:19

Climbing frame is also called lifting frame, according to its power source can be divided into hydraulic type, electric type, human hand-pulled type and other major categories. It is a new type of scaffolding system developed in recent years, mainly used in high-rise shear wall type buildings. It can climb or descend upwards along the building. This system makes a complete change in scaffolding technology.

2022-12-30 10:18

Climbing frame is also called lifting frame, according to its power source can be divided into hydraulic type, electric type, human hand-pulled type and other major categories. It is a new type of scaffolding system developed in recent years, mainly used in high-rise shear wall type buildings. It can climb or descend upwards along the building. This system makes a complete change in scaffolding technology.

2019-09-06 17:43

Climbing process: all check the climbing organization, frame and obstacles → install electric hoist and debug pre-tightening → dispense with the upper frame and structure pulling connection → dispense with the safety net on the outside of the frame at the broken piece → raise the frame 100mm → remove the unloading seat → raise the frame one floor high → install the unloading seat → pulling connection to the upper climbing frame (the distance between pulling connections is not more than 6m) → close the safety net on the outside of the frame at the broken piece → raise the Wire rope turnover to the upper installation position → remove the lowermost anti-fall bar, installation to the uppermost position → construction construction layer → installation of the upper adjustable tie rod, attached wall guide seat → check before raising → ready to enter the next lifting cycle.

2019-09-06 17:44

The construction load (weight of personnel, materials and machinery) used on each 1m?shelf surface of the working layer shall not exceed the following prescribed values or construction design values; the standard value of the construction load (weight of personnel, apparatus and materials on the working layer), the structural scaffolding takes 3kN/m2, and the decoration scaffolding takes 2kN/m?

2019-09-06 17:45